Before I was tasked with the responsibility of coordinating all the fabrication and delivery of the structural steel crap, I was working major tagged mechanical equipment...

This is a 580 ton Auxuliary Boiler from a company called Macchi, from Italy...it had a 65 week lead time (engineering/fabrication/testing) and the package was almost $6MUSD...

It's basically a full "Plug N Play" Unit...

For 11 months I had weekly conference calls with these guys, I'd review schedules, I'd check their unpriced purchase orders for 80 sub suppliers they had, I'd ensure their DWGS and Calcs were submitted on time, etc etc...

In January, I was pulled off the job so I never got to see the finished product...

Well, it shipped on a 500ft vessel last week from Porto Marghera to the Port of Lake Charles...

Fruits of my labor...

Vessel was the BBC Aquamarine, FYI...




IMG_20170506_111445.jpg
IMG_20170506_121713.jpg
IMG_20170506_125118.jpg
IMG_20170506_132047.jpg
 
Before I was tasked with the responsibility of coordinating all the fabrication and delivery of the structural steel crap, I was working major tagged mechanical equipment...

This is a 580 ton Auxuliary Boiler from a company called Macchi, from Italy...it had a 65 week lead time (engineering/fabrication/testing) and the package was almost $6MUSD...

It's basically a full "Plug N Play" Unit...

For 11 months I had weekly conference calls with these guys, I'd review schedules, I'd check their unpriced purchase orders for 80 sub suppliers they had, I'd ensure their DWGS and Calcs were submitted on time, etc etc...

In January, I was pulled off the job so I never got to see the finished product...

Well, it shipped on a 500ft vessel last week from Porto Marghera to the Port of Lake Charles...

Fruits of my labor...

Vessel was the BBC Aquamarine, FYI...




View attachment 339042 View attachment 339043 View attachment 339044 View attachment 339045
That sucks that you didn't get to see it finished after all that but it's still impressive.

Lake Charles isn't too far from me. Do you know where it's going? My dad is a tug boat captian and sometimes pilots or escorts ships through the Mississippi and the canals. Would be funny if he came across it.
 
That sucks that you didn't get to see it finished after all that but it's still impressive.

Lake Charles isn't too far from me. Do you know where it's going? My dad is a tug boat captian and sometimes pilots or escorts ships through the Mississippi and the canals. Would be funny if he came across it.
Ethylene Plant ;)
 
Structural Steel is not fun...

You're looking at @ 1360 tons of structural steel needed for a heater module...

About 17 million worth of steel ;)



View attachment 333164 View attachment 333165
Update on the assembly of the Heater Module Piperack and Heater radiant panels.

Pipe and cable tray installation is ongoing :)

This is being done at a shop in Louisiana...

Tomorrow, I'll post pics of a shop in Alabama that I'm at right now...gonna take a shop tour tomorrow...

This is just beautiful.......




DSC00310.JPG

DSC00313.JPG

DSC00235.jpg
 
Back
Top